Sightful Invest
  • Business
  • Investing
  • Politics
  • Stock
Top Posts
James Comer to accuse Tim Walz of being...
Expired Obamacare subsidy deal inches toward Senate floor...
JONATHAN TURLEY: Impeachment obsession returns as Democrats recycle...
Rep LaMalfa’s death further shrinks Republican House majority
China bans military-use exports to key US ally...
From sanctions to seizure: What Maduro’s capture means...
Scathing audit reveals more fraud concerns inside top...
Emmer warns Walz could end up ‘in cuffs’...
Trump admin’s new nutrition guidelines target ultra-processed foods,...
Graham warns Iranian ayatollah: ‘Trump is gonna kill...
  • Business
  • Investing
  • Politics
  • Stock

Sightful Invest

Investing

Exceptional Lithium Intercept Extends Red Mountain Discovery Further to the North

by admin May 19, 2025
May 19, 2025
Exceptional Lithium Intercept Extends Red Mountain Discovery Further to the North

Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report assay results from the first of six holes completed as part of its highly successful April 2025 diamond drilling campaign at the 100%-owned Red Mountain Lithium Project in Nevada, USA. Drill-hole RMDD003 has returned three high- grade intersections of lithium mineralisation:

  • 32.4m @ 3,260ppm Li / 1.74% Lithium Carbonate Equivalent1 (LCE) from 57.2m, including an internal high-grade zone grading 8.6m @ 5,060ppm Li / 2.69% LCE from 67.7m;
  • 13.8m @ 1,330ppm Li / 0.71% LCE from 39.6m; and
  • 23.3m @ 1,610ppm Li / 0.86% LCE from 94.4m to End-of-hole.

Key Highlights

  • Outstanding lithium mineralisation returned in assays for diamond drill-hole RMDD003, which intersected:
    • 32.4m @ 3,260ppm Li from 57.2m, including 8.6m of ultra high-grade mineralisation @ 5,060ppm Li from 67.7m;
    • 13.8m @ 1,330ppm Li from 39.6m; and
    • 23.3m @ 1,610ppm Li from 94.4m to end-of-hole
  • RMDD003 marks the highest-grade lithium intercept recorded to date at Red Mountain.
  • Mineralisation successfully extended 630m north of previous northernmost intersection in hole RMDD002.
  • Hole ends in lithium, with mineralisation remaining open down-dip to the east and along strike to the north.
  • Assays pending from five other recently completed drill- holes.

To hear CEO Matt Healy discuss this ASX Release click here

The thick zones of lithium mineralisation encountered in the northernmost drill-hole at Red Mountain highlight the increasing scale of the project, with strong lithium mineralisation now intersected in all drill- holes spanning a north-south strike extent of over 5.6km and surface sample geochemistry indicating further potential to the north, south and west of the current drilled extents7, 9 (Figure 3).

Of particular significance in hole RMDD003 is the high-grade nature of the mineralisation. The nearest drill-hole is RMDD002, which intersected 32.1m @ 2,050ppm within a broader 86.9m intersection at 1,470ppm Li from 18.3m. The high-grade zone in RMDD002 has persisted north to RMDD003, and increased in grade significantly to over 3,000ppm lithium.

Assays are pending for the other five holes drilled as part of the April diamond drilling campaign.

Astute Chairman, Tony Leibowitz, said:

“Our 2025 exploration campaign is off to a fantastic start, with exceptional assays returned for the first step-out diamond hole, RMDD003. We are impressed by the thickness and grade of the mineralisation, with the high-grade intercept returned from this hole showing that the previously identified high-grade zone extends for a considerable distance to the north.

“This provides further indication that Red Mountain is unfolding as a lithium discovery of significance in North America. With mineralisation now defined by drilling over a strike length of almost 6 kilometres, we are looking forward to seeing what the remaining drill-holes will deliver. The information obtained from this round of drilling should put us on a clear trajectory to advance Red Mountain towards a maiden JORC Mineral Resource Estimate later this year.”

Background

Located in central-eastern Nevada (Figure 4) adjacent to the Grand Army of the Republic Highway (Route 6), which links the regional mining towns of Ely and Tonopah, the Red Mountain Project was staked by Astute in August 2023.

The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse Camp Formation2. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits (see Figure 4) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3, American Battery Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit4 and American Lithium (TSX.V: LI) 9.79Mt LCE TLC Lithium Project5.

Astute has completed substantial surface sampling campaigns at Red Mountain, which indicate widespread lithium anomalism in soils and confirmed lithium mineralisation in bedrock with some exceptional grades of up to 4,150ppm Li2,8 (Figure 3).

A total of 13 RC and diamond drill holes have been drilled at the project for a combined 1,944m, prior to this current drilling program. These campaigns were highly successful, intersecting strong lithium mineralisation in every hole9.

Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of lithium of up to 98%, varying with temperature, acid strength and leaching duration, and proof of concept beneficiation test-work has indicated the potential to upgrade the Red Mountain mineralisation10,11.

Results

Hole RMDD003 successfully intersected three zones of lithium mineralised clay-bearing mudstones and sandstone, separated by narrow zones of unmineralised rocks (Figure 1). The intersections are as follows:

  • 13.8m @ 1,330ppm Li / 0.71% LCE from 39.6m to 53.4m;
  • 32.4m @ 3,260ppm Li / 1.74% LCE from 57.2m to 89.6m; and
  • 23.3m @ 1,610ppm Li / 0.86% LCE from 94.4m to End-of-hole (117.7m).

The best grades were developed in the most clay-rich zones (Figure 2). An internal very high-grade zone of 8.6m returned a grade of 5,060ppm Li, with a maximum single sample grade of 5,660ppm Li from 69.2-70.7m (227-232ft), which is the drill sample with the highest lithium grade achieved to date at the project.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Biden interview audio reveals who brought up Beau’s death — and it wasn’t Hur
next post
WCN Raises A$14.4M at an Average 29% Premium to Market Close

You may also like

CHARBONE Completes Its First Helium Delivery to the...

October 23, 2025

Shallow, high-grade gold in Sandstone drilling

April 10, 2025

Group Eleven Intersects 7.5m of 20.1% Zn+Pb and...

March 25, 2025

First Helium Completes Drilling 7-15 Well & Cases...

February 13, 2025

US Plans to Triple Nuclear Power Capacity by...

November 16, 2024

CHARBONE Hydrogen Announces a Second Closing of its...

December 3, 2024

Red Metal Resources Planning 2025 Work Program on...

February 20, 2025

Lucara Unearths 2,492 Carat Diamond in Botswana, Second...

August 23, 2024

Finlay Minerals Announces Closing of Non-Brokered Private Placement...

October 18, 2025

Bold Ventures Closes $378,000 Non-Brokered Flow-Through Private Placement

December 11, 2025

Recent Posts

  • James Comer to accuse Tim Walz of being ‘asleep at the wheel’ at fraud hearing
  • Expired Obamacare subsidy deal inches toward Senate floor vote amid bipartisan talks
  • JONATHAN TURLEY: Impeachment obsession returns as Democrats recycle lawfare to fire up their base
  • Rep LaMalfa’s death further shrinks Republican House majority
  • China bans military-use exports to key US ally as Taiwan tensions rise

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Categories

    • Business (964)
    • Investing (3,814)
    • Politics (4,611)
    • Stock (4)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sightfulinvest.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2026 Sightful Invest. All Rights Reserved.