Sightful Invest
  • Business
  • Investing
  • Politics
  • Stock
Top Posts
US, China agree to open direct military hotline...
Syria’s interim President al-Sharaa expected to meet with...
Obama’s presence and Trump’s policies consume 11th hour...
Zohran Mamdani emerges as Republicans’ government shutdown boogeyman
Obama’s presence and Trump’s policies consume 11th-hour rally...
Boasberg’s role in ‘Arctic Frost’ probe sparks fury...
Bipartisan senators call on Hegseth to release strike...
Trump touts ‘12 out of 10’ meeting with...
Trump’s ‘nuclear’ demand not landing for Senate Republicans...
Food stamp benefits for 42 million Americans in...
  • Business
  • Investing
  • Politics
  • Stock

Sightful Invest

Investing

Munda Gold Mine Mining Progresses: First Blast

by admin June 19, 2025
June 19, 2025
Munda Gold Mine Mining Progresses: First Blast

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Freegold Achieves over 90% Gold Recovery Using BIOX® and greater than 92% Gold Recovery using POX – Additional Metallurgical Work Remains Ongoing
next post
Nifty Copper Project Virtual Site Visit

You may also like

Turkey Eyes Chinese Partnership to Develop Rare Earths...

September 4, 2024

Kipushi Zinc Mine Reopens in DRC After 31...

November 26, 2024

NorthStar Gaming Launches Spring Tournament Series with Up...

March 21, 2025

Coelacanth Energy: Natural Gas Production, Exploration at the...

November 5, 2024

Biggest Canadian Defense Contractors and ETFs in 2025

July 17, 2025

LME Copper vs. COMEX Copper

January 31, 2025

Lode Gold Receives Tsxv Conditional Acceptance for Spinout...

December 5, 2024

Exploring Mining’s Silver Discussion with Apollo Silver, and...

June 26, 2025

Top 10 Phosphate Countries by Production (Updated 2024)

August 1, 2024

Top 10 Uranium-producing Countries (Updated 2024)

November 6, 2024

Recent Posts

  • US, China agree to open direct military hotline after Xi-Trump summit
  • Syria’s interim President al-Sharaa expected to meet with Trump in first visit by Syrian leader to White House
  • Obama’s presence and Trump’s policies consume 11th hour rally to keep NJ blue
  • Zohran Mamdani emerges as Republicans’ government shutdown boogeyman
  • Obama’s presence and Trump’s policies consume 11th-hour rally to keep NJ blue

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Categories

    • Business (946)
    • Investing (3,328)
    • Politics (4,080)
    • Stock (4)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sightfulinvest.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 Sightful Invest. All Rights Reserved.