Sightful Invest
  • Business
  • Investing
  • Politics
  • Stock
Top Posts
Key House committee advances nationwide voter ID bill,...
FDA refuses to review Moderna’s mRNA flu vaccine...
Trump, Netanyahu to meet at White House in...
Vance warns Iran that ‘another option on the...
Meta, Google face massive liability as ‘addicted kids’...
Trump to host ‘Clean Beautiful Coal’ event, calls...
Russia agrees to abide by expired New START...
Israel joins Board of Peace ahead of Netanyahu-Trump...
Bondi confirms DOJ has received criminal referral alleging...
Schumer, Dems choose partial shutdown as negotiations hit...
  • Business
  • Investing
  • Politics
  • Stock

Sightful Invest

Investing

BC to Curb AI Energy Use, Ban Crypto Mining in Bid to Power Resource Sector

by admin October 22, 2025
October 22, 2025
BC to Curb AI Energy Use, Ban Crypto Mining in Bid to Power Resource Sector

The BC government has unveiled new energy policy changes aimed at curbing electricity use from artificial intelligence (AI) data centers, while permanently banning new cryptocurrency-mining projects and fast-tracking the North Coast Transmission Line.

Tabled by Energy Minister Adrian Dix, the proposed legislation will replace the Canadian province’s traditional first-come, first-served grid connection policy with a competitive bidding system for emerging industries such as AI and data centers, as well as hydrogen production for export.

Under the new framework, these sectors will be limited to a combined 400 megawatts of new power allocation every two years: 300 megawatts for AI operations and 100 megawatts for other data centers, with hydrogen limits to be determined by market conditions.

Dix said the move was designed to prevent British Columbia from falling into the same trap as regions in the United States where explosive growth in data center demand has strained power grids and driven up electricity costs for residents.

“The allocation framework allows for the paced growth of these sectors and avoids mistakes we’ve seen in other jurisdictions where growth has outpaced infrastructure, resulting in higher costs for everyday residential customers,” Dix told reporters in Victoria.

“We won’t make that mistake. We will prioritize the projects that provide the best, greatest benefit to British Columbians.”

The province’s publicly owned utility, BC Hydro, will oversee the competitive call process beginning in early 2026.

According to the Ministry of Energy, Mines and Low Carbon Innovation, British Columbia has been inundated with requests from data-heavy industries seeking grid access, particularly as AI development accelerates worldwide.

By contrast, power allocations for resource-based industries such as mining, oil and gas, forestry, and hydrogen production will remain uncapped due to their higher employment and revenue contributions to the province.

Additionally, hydrogen-for-export projects will be enabled in a paced way, with the government prioritizing hydrogen energy production for domestic use.

“Other jurisdictions have been challenged to address electricity demands from emerging sectors and, in many cases, have placed significant rate increases on the backs of ratepayers,” the ministry said in a statement.

The new rules would also formalize a decision that has been years in the making. A temporary moratorium on new cryptocurrency mining projects, which was first imposed in 2022 and extended in 2024, will now become permanent.

The government cited crypto mining’s “disproportionate energy consumption and limited economic benefit” as justification for the ban. Unlike AI or manufacturing, officials noted that crypto mining generates little employment while consuming large amounts of power.

The policy stands in sharp contrast to neighboring Alberta, which has embraced data infrastructure investment and is targeting C$100 billion in new data center spending over the next five years. Alberta’s government has promoted its abundant natural gas reserves as a key energy source for such projects.

In a related move, the BC government announced plans to fast-track the construction of the North Coast Transmission Line, a massive infrastructure project aimed at unlocking new mining and industrial development in Northern British Columbia.

The government will exempt the project from a regulatory certification process that normally requires public hearings before the BC Utilities Commission, cutting as much as 18 months from its development timeline.

The 450 kilometer line, which will initially connect Prince George to Terrace, carries a price tag now estimated at C$6 billion, which is double the previous year’s estimate of C$3 billion.

Once complete, officials say it will supply high-voltage electricity to a region rich in mineral resources but long constrained by limited power access. Government projections estimate that the project could create about 9,700 full-time jobs and contribute nearly US$10 billion per year to the province’s GDP.

Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

previous post
China accuses US of yearslong cyberattack on national time service
next post
West High Yield Resources Secures Approval for Record Ridge Mine

You may also like

NevGold Announces Closing of C$10M Brokered Private Placement...

November 19, 2025

Cygnus Metals to Present at the Precious Metals...

May 16, 2025

Jp Cortez: Gold, Silver in Sound Money Renaissance,...

December 12, 2024

Ramp Metals Announces Closing of Oversubscribed Non-Brokered Private...

May 26, 2025

ION Announces US$13.5M Joint Venture on Urgakh Naran,...

March 27, 2025

Cygnus and Doré Copper Complete Merger

January 2, 2025

MLS Continues to Advance and Expand its Flagship...

September 13, 2024

AMENDED FROM SOURCE – Blue Sky Uranium Increases...

April 17, 2025

Osisko Metals Acquires Additional Claims Near Gaspé Copper

December 7, 2024

Significant Exploration Target for Golden Ridge, NE Tasmania

November 12, 2024

Recent Posts

  • Key House committee advances nationwide voter ID bill, setting up 2026 election fight
  • FDA refuses to review Moderna’s mRNA flu vaccine application
  • Trump, Netanyahu to meet at White House in high-stakes talks on Iran, Gaza plan
  • Vance warns Iran that ‘another option on the table’ if nuclear deal not reached
  • Meta, Google face massive liability as ‘addicted kids’ trial continues in LA

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Categories

    • Business (973)
    • Investing (4,091)
    • Politics (4,927)
    • Stock (4)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sightfulinvest.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2026 Sightful Invest. All Rights Reserved.