Sightful Invest
  • Business
  • Investing
  • Politics
  • Stock
Top Posts
The world’s top nuclear powers have no arsenal...
Ghislaine Maxwell to appear before House Oversight Committee...
JASON CHAFFETZ: 2028 election will be a referendum...
Ghislaine Maxwell pleads Fifth Amendment, dodges questions in...
GOP accelerates Trump judge confirmations as pressure builds...
Japan’s ‘Iron Lady’ thanks Trump as party secures...
As Epstein-linked appointment sparks backlash, UK PM Starmer...
Jasmine Crockett’s vulgar 6-word message for Trump in...
Ghislaine Maxwell told lawmakers Trump, Clinton ‘innocent of...
Armory Mining To Conduct a Series of Airborne...
  • Business
  • Investing
  • Politics
  • Stock

Sightful Invest

Investing

Anteros Metals Announces Plans for a Phase 1 Extension Drilling Program at the Seagull Critical Minerals Project, Ontario

by admin February 9, 2026
February 9, 2026
Anteros Metals Announces Plans for a Phase 1 Extension Drilling Program at the Seagull Critical Minerals Project, Ontario

Anteros Metals Inc. (CSE: ANT) (‘Anteros’ or the ‘Company’) is pleased to announce plans for a Phase 1 extension drilling program at the Seagull Critical Minerals Project (the ‘Project’), located approximately 80 kilometres northeast of Thunder Bay, Ontario, and operated by Rift Minerals Inc. (‘Rift’), under the option agreement announced on October 9, 2025 (the ‘Agreement’), pursuant to which Anteros may earn up to a 49% interest in the Project.

Subsequent to completion of Phase 1 drilling activities, Anteros and Rift have entered into an addendum to the Agreement that provides Anteros with the right, but not the obligation, to conduct a revised Phase 1 extension drilling program at the Project. The addendum provides for Rift to continue as operator and allows expenditures incurred under the revised Phase 1 program to be credited against potential Phase 2 exploration expenditures, should Anteros elect to proceed following receipt of an updated NI 43-101 compliant technical report. Any Phase 1 extension drilling will remain subject to final program design, approved budgets, and field conditions.

The Phase 1 extension follows the completion of drill hole RM26-01, which intersected discontinuous orthomagmatic sulphide mineralization within the basal cumulate sequence between approximately 589 and 608 metres, as well as a gas-bearing interval at approximately 877 metres within a narrow fault zone in Archean basement rocks of the Quetico Subprovince. The gas occurrence is situated at a similar stratigraphic position to gas reported in historical hole WM-01-08 located approximately 100 metres away. The significance, continuity, and composition of the gas remain under evaluation. Sulphide mineralization observed in the basal cumulate sequence is disseminated to locally weakly net-textured. Laboratory assay results from the sulphide-bearing intervals are pending.

Integrated interpretation of drilling and geophysical datasets, including Ambient Noise Tomography (‘ANT’) velocity modelling has been used by Rift to refine the interpreted geometry of the Seagull Intrusion and underlying basement, and is informing evaluation of Phase 1 extension drilling options. These interpretations are preliminary in nature and subject to revision as additional data become available.

The Phase 1 extension is designed to build on drilling observations and integrated geological and geophysical interpretation with the following technical objectives:

  • Continue evaluating orthomagmatic sulphide mineralization associated with Ni-Cu-PGE systems at the basal contact of the Seagull Intrusion.

  • Test the ~877 metre elevation to evaluate the presence and geological context of gas within a sub-horizontal structural feature.

  • Collect samples for laboratory analysis to support evaluation of sulphide mineralization and gas occurrence, where encountered.

The Company is currently evaluating drilling options to pursue these technical objectives while leveraging existing historical drill infrastructure. Given the depth of the target horizons, previously completed drill holes are being assessed as the platforms for any extension drilling to efficiently test mineralization and gas-bearing structures at depth while managing time, cost, and surface disturbance. Phase 1 extension drilling will be subject to final program design, field conditions, and financing.

A geological and geophysical section summarizing the integrated interpretation informing Phase 1 extension planning is shown in Figure 1.

Figure 1: Interpreted geological and geophysical section across the Seagull Intrusion, incorporating drilling information and ANT velocity data. The section is oriented NE-SW and viewed toward the northwest, with historical drill holes shown in projected composite view. The gas-bearing interval (~877 m) and disseminated sulphide interval (~589-608 m) shown along drill hole RM26-01 are observational and based on drilling results. Interpretations are preliminary in nature and subject to revision as additional data become available. The figure is provided for geological context only and does not imply mineral resources, continuity, targeting conclusions, or economic significance. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/9885/283191_bab54286d425f91b_002full.jpg

‘The Phase 1 extension represents a logical next step to build on observations from drill hole RM26-01, including the occurrence of gas and basal sulphide mineralization,’ said Trumbull Fisher, CEO of Anteros. ‘By leveraging existing drill holes, we are able to further evaluate these features and advance our technical understanding of the Seagull Critical Minerals system.’

The Company will provide further updates as program parameters are finalized and additional information becomes available. All observations to date are visual or preliminary in nature, based on limited drilling and geophysical information, and are subject to revision. Laboratory assay results are pending.

ABOUT THE SEAGULL PROJECT

The Project is located approximately 80 kilometres northeast of Thunder Bay, Ontario, and covers the interpreted mafic-ultramafic Seagull Intrusion within the Nipigon Basin. Historical exploration between 1998 and 2012 included airborne geophysical surveys and approximately 20,000 metres of diamond drilling, which reportedly intersected disseminated to semi-massive sulphide mineralization containing nickel, copper, and platinum-group elements along parts of the intrusion’s basal contact and reported the presence of naturally occurring gases. These historical results have not been independently verified by Anteros.

In 2024, Rift completed an Ambient Noise Tomography (‘ANT’) survey to refine the internal geometry of the Seagull Intrusion and to identify subsurface velocity contrasts interpreted to reflect lithological and alteration variations. These interpretations remain unverified by Anteros.

QUALIFIED PERSON

The scientific and technical information in this news release relating to the Seagull Project has been prepared by Rift Minerals Inc. and has been reviewed and approved by Dr. Geoff Heggie, P.Geo. (Ontario), a Qualified Person under National Instrument 43-101, who is independent of Anteros Metals Inc. This information has not been independently verified by Anteros Metals Inc. and is provided for geological context only.

ABOUT Anteros Metals Inc.

Anteros Metals Inc. is a Canadian mineral exploration company focused on advancing a pipeline of projects across Newfoundland and Labrador and select Canadian jurisdictions. The Company applies a technically driven, data-supported exploration approach targeting critical minerals and emerging strategic commodities relevant to the global energy transition.

ABOUT RIFT MINERALS INC.

Rift Minerals Inc. is a private corporation based in Thunder Bay, Ontario, founded in 2024 by Steven Stares, Michael Stares, Cliff Hickman and Abraham Drost, M.Sc., P.Geo. (Ontario). Rift has completed early-stage exploration work on the Seagull Project, including an Ambient Noise Tomography survey completed by Sisprobe, France.

For further information:

Email: info@anterosmetals.com | Phone: +1-709-769-1151
Web: www.anterosmetals.com

On behalf of the Board of Directors:
Chris Morrison
Director
chris@anterosmetals.com | +1-709-725-6520
16 Forest Road, Suite 200, St. John’s, NL, Canada A1X 2B9

Cautionary Statement Regarding Forward-Looking Information

This news release may contain ‘forward-looking information’ and ‘forward-looking statements’ within the meaning of applicable Canadian securities legislation. All information contained herein that is not historical in nature may constitute forward-looking information. Forward-looking statements herein include but are not limited to statements relating to the prospects for development of the Company’s mineral properties, and are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Except as required by law, the Company disclaims any obligation to update or revise any forward-looking statements. Readers are cautioned not to put undue reliance on these forward-looking statements.

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/283191

News Provided by TMX Newsfile via QuoteMedia

This post appeared first on investingnews.com

previous post
Southern Silver Intersects 5.8 metres averaging 781g/t AgEq at Cerro Las Minitas Project in Durango, México
next post
Crypto Market Update: Tether Doubles Down With US$150 Million Gold.com Stake

You may also like

Cobalt Market Update: Q3 2024 in Review

November 5, 2024

Altech – CERENERGY Battery 46.7M Euro German Grant...

September 2, 2025

Nordic Nickel Limited (ASX: NNL) – Trading Halt

September 23, 2024

Stallion Uranium Provides Corporate Update

May 22, 2025

Funding the Energy Transition: The Role of Public...

March 25, 2025

Freegold Provides an Update on its 2026 Plans

January 23, 2026

Nickel Price 2024 Year-End Review

January 8, 2025

CORRECTED: CHARBONE Hydrogen is Acquiring Hydrogen Production Assets...

September 6, 2025

Cartier Resources: Advancing Cadillac Project in the Prolific...

April 2, 2025

Where Does Tesla Get its Lithium? (Updated 2024)

September 10, 2024

Recent Posts

  • The world’s top nuclear powers have no arsenal limits, here are the countries with nukes
  • Ghislaine Maxwell to appear before House Oversight Committee lawmakers for Epstein probe deposition
  • JASON CHAFFETZ: 2028 election will be a referendum on our AI-dominated future
  • Ghislaine Maxwell pleads Fifth Amendment, dodges questions in House Oversight Epstein probe
  • GOP accelerates Trump judge confirmations as pressure builds to kill Senate blue slip

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Categories

    • Business (972)
    • Investing (4,071)
    • Politics (4,907)
    • Stock (4)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: sightfulinvest.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2026 Sightful Invest. All Rights Reserved.